Gables WaterWay
Miami, Florida

Project Type: Feasibility study
Project Status: Planned
Completion Date: January 2014
Site Area: 4.8 acres
Team: PlusUrbia
Client: Bankers International Realty


Feasibility study for an area on the south side of South Dixie Highway (US1), across the street from the University of Miami.


The task consisted of a preliminary zoning study of each parcel. It also provided a volumetric study and renders of the parcels combined, maximizing the permitted development under the current code.


PlusUrbia worked on this project for a private developer to determine the best way to take advantage of this iconic site and unlock its full potential.


The design for the buildings in the development fit in with the surrounding context of the site and with the characteristic Architecture unique to Coral Gables.




Gables WaterWay
Miami, Florida
more info
Gables WaterWay
Miami, Florida

Project Type: Feasibility study
Project Status: Planned
Completion Date: January 2014
Site Area: 4.8 acres
Team: PlusUrbia
Client: Bankers International Realty


Feasibility study for an area on the south side of South Dixie Highway (US1), across the street from the University of Miami.


The task consisted of a preliminary zoning study of each parcel. It also provided a volumetric study and renders of the parcels combined, maximizing the permitted development under the current code.


PlusUrbia worked on this project for a private developer to determine the best way to take advantage of this iconic site and unlock its full potential.


The design for the buildings in the development fit in with the surrounding context of the site and with the characteristic Architecture unique to Coral Gables.